Building safety
Version 1.12.0. For landlords' building safety departments and accountable persons: higher-risk buildings with their key building information, components and fire safety measures, inspections on their cycles and fire risk assessment actions; building changes assessed and approved by someone new; safety cases with their schedule of hazards, measures and evidence; mandatory occurrences reported to the Building Safety Regulator on time; damp, mould and other hazards under Awaab's Law, with time limits in hours and working days; residents' building safety concerns; an assets register whose models, drawings and certificates show on the cases about each asset; building control applications through Gateways 2 and 3; smoke and carbon monoxide alarm checks; registers of safety certificates and construction products; components and products classified by Uniclass; homes' humidity, temperature, carbon dioxide and mould risk from sensors, opening damp and mould cases, read from AICO HomeLINK with each home's alarms and sensors; a public site, letters, reports and a dashboard.
Keep each building's model, drawings and scans as files on its entry in the Assets register, and choose that asset on its cases: they then show on every case about it, without copies. Its people are kept there too, once: choosing the asset puts them on the case.
| Case type | Choosing the asset puts on the case |
|---|---|
| Higher-risk building | Principal accountable person, accountable persons, building safety manager, fire risk assessor, managing agent |
| Building change | Its building safety manager, as the approver |
| Safety case, Mandatory occurrence | Its principal accountable person, as the accountable person |
| Building safety concern | Its building safety manager, as the handler (and fills in the building) |
| Damp, mould or another hazard | Its responsible officer, as the surveyor (and fills in the home's address) |
| Building control application | Its responsible officer, as the client's lead |
The building's components and fire safety measures, its fire risk assessment actions and its inspections (communal and flat entrance fire doors, fire risk assessments, firefighting equipment, electrical tests, lift examinations, water hygiene) are kept on the asset too. The higher-risk building case shows them and changes them there, so a component added on the asset, or a fire door check recorded on any case about the building, is the same everywhere; each open case keeping the kind gets the next check as its key date. Building files opened before 1.3.0 keep their own.
Each building is the anchor of its golden thread. Record its changes, safety case and occurrences as parts of it, and its blocks and homes too if you keep them, so everything about the building is one click away. Documents on every case type have the details an information management system asks for: kind, status (work in progress, shared, published, archived), suitability, revision and who produced it. To keep models, drawings and laser scans, turn their kinds on in Models and drawings.
Higher-risk building
References start HRB.
- Details: the asset (which fills in the building name and address, and takes a corrected address back), building name, address, height, storeys, homes, year built, structure, external walls, evacuation strategy, sprinklers, Building Safety Regulator registration number and date, the building assessment certificate, a link to the building's model in another system, and why the file closed.
- Statuses: Occupied, Major works under way, Empty (on hold), Closed.
- Actions: Start major works, Finish major works (with tasks to update the key building information within 28 days and to review the safety case), Record that the building is empty, Record that the building is occupied again, Close the file and Reopen.
- Inspections, each putting the next one in the diary as a key date:
- Communal fire door check, every 3 months;
- Flat entrance door check, every 12 months, with the doors not checked for lack of access;
- Fire risk assessment, its risk level setting the next review: 12 months when trivial to moderate, 6 when substantial, 3 when intolerable;
- Firefighting equipment check, monthly, recording any fault reported to the fire and rescue service;
- Electrical installation test, every 5 years, or a month after an unsatisfactory one;
- Lift thorough examination, every 6 months;
- Water hygiene risk assessment, every 2 years.
- Lists: Components and fire safety measures (kind, where it is, Uniclass code, manufacturer, product, fire performance, installed on, its element ID in the building model and next service). A component's element ID has Show in model, which opens the building's model on the case with that element chosen (Elements in a model). Fire risk assessment actions (finding, priority, action, owner, due date and status). Either can be imported from a spreadsheet.
- Key dates: the next of each inspection, the safety case review and the residents' engagement strategy review, with rules that make tasks before each falls due.
- Roles: Principal accountable person, Accountable person, Building safety manager, Fire risk assessor, Managing agent, Resident (can follow the building in the client portal).
Building change
References start CHG.
- Details: kind of change, what is changing and why, the components and areas affected, the safety impact and its assessment, whether it needs building control approval from the Building Safety Regulator (and the application reference), when works start and finish, and whether the key building information and safety case have been updated.
- Statuses: Requested, Assessing the safety impact, Awaiting approval (handled by someone new), Approved, Works under way, Completed, Not approved, Withdrawn.
- Actions: Assess the safety impact, Send for approval (needs the safety impact and its assessment), Approve, Do not approve, Return for more assessment, Start the works, Record the change as complete (with tasks to update the building's record and to tell the regulator about changes to the key building information within 28 days) and Withdraw.
- Time limits: the approval decision within 10 working days.
- Roles: Requested by, Approver, Contractor, Designer.
Safety case
References start SC.
- Details: the report version, when the regulator directed an application, when it was applied for, the decision and any conditions.
- Statuses: Drafting, Internal review (handled by someone new), Approved by the accountable person, Directed to apply, Applied for the certificate (on hold), Certified, Replaced by a newer safety case.
- Time limits: the building assessment certificate application within 28 days of the direction.
- List: Hazards, measures and evidence: each major hazard (spread of fire or smoke, or structural failure), its scenario, the measure that prevents or limits it, the evidence, who owns it, whether the evidence is in place, and when to review it. Save it as a PDF schedule and put it in the safety case report's bundle.
- Key dates: the next review, with a task four weeks before.
Mandatory occurrence
References start MOR.
- Details: whether it concerns structural failure or the spread of fire or smoke, when it was identified, what happened, where, what was done at once, the notice reference and dates, the cause and what will change.
- Statuses: Identified, Notice sent, Report sent, Closed.
- Time limits: the notice to the regulator, which is due as soon as you can, is given 24 hours; the full report is due within 10 calendar days of identifying the occurrence.
- Actions: sending the report makes tasks to review the safety case and the residents' engagement strategy.
Damp, mould or another hazard
References start HAZ. Under Awaab's Law (the Hazards in Social Housing (Prescribed Requirements) (England) Regulations 2025).
- Details: the hazard, what was reported, the home, whether someone vulnerable lives there, the severity, the investigation and its findings, the written summary, the safety works and whether alternative accommodation was offered.
- Statuses: Reported, Emergency: make safe, Investigated, Summary sent, Works under way, No access (on hold), Completed, No hazard found.
- Time limits:
- Investigate and make safe within 24 hours of being treated as an emergency;
- Investigation within 10 working days of the report;
- Written summary within 3 working days of the investigation (the Send the written summary action makes the letter);
- Safety works to begin within 5 working days of the investigation.
- Public form: tenants can report damp, mould or another hazard on the public site.
- Opened by sensors: a home's mould risk at the alert level for 24 hours, or at the warning level for 24 hours where someone vulnerable lives there, or a damp or mould alert from the sensor platform, opens one of these cases about the home, with the readings in its description. If one is already open for the home, it gets a note instead (see Readings and alerts).
Building safety concern
References start BSQ. A resident's concern or complaint under the accountable person's complaints system: acknowledged within 5 working days, answered within 20 (the Send our response action makes the letter, which tells the resident they can refer it to the regulator), and the referral recorded if they do. Residents can raise one on the public site.
Building control application
References start BCA. An application to the Building Safety Regulator, as building control authority for higher-risk buildings, from Preparing the application, through Awaiting the Regulator's decision (Gateway 2) and Works under way, to Awaiting the completion certificate (Gateway 3) and Completion certificate issued; or Refused or Withdrawn.
- Details: the asset, the kind of application (a new building, or work to an existing one), the Regulator's reference, principal designer and contractor, when it was submitted and decided, the decision and its requirements, and the completion certificate's application, issue and reference.
- Key dates: Submit to the Regulator records when its decision is due, and Apply for the completion certificate when that decision is. The Regulator has 12 weeks for a new building, 8 for work to an existing one, and 8 for a completion certificate, unless agreed otherwise.
- Tasks: share the approval's requirements with the designer and contractor; hand over the golden thread with the completion application; add the completion certificate to the certificates register.
Smoke and carbon monoxide alarms
References start ALM. A home's alarms checked on the day a tenancy starts, after a fault is reported, or routinely: a smoke alarm on every storey with living accommodation, and a carbon monoxide alarm in every room with a fixed combustion appliance other than a gas cooker (Smoke and Carbon Monoxide Alarm (England) Regulations 2015, as amended in 2022). Choose the home as its asset, which fills in the address; what the check finds (alarms on every storey and in every room with an appliance, whether there is an appliance) and the date go back to the asset when saved. Record the alarms as working closes it; Record a repair or fitting needed sets a task to repair them as soon as reasonably practicable, then Record the repair.
Registers
Assets (
AST): buildings, blocks, homes, plant and equipment, land, each with its address or place on the map, what it is part of, its element in the model (a building, floor or space, filled in from COBie's ExtIdentifier, so its readings show on the model), the departments responsible (one asset is kept once for every department that looks after it), and its smoke and carbon monoxide alarms, due for review 14 days before the next alarm check. Keep its models, drawings and scans as its files: they show on every case that names it. Its People are its principal accountable person, accountable persons, building safety manager, fire risk assessor, managing agent and responsible officer, put on the cases that name it (above). Homes record whether someone vulnerable lives there. Its readings from sensors, through the public API:Measure Warning Alert Humidity (%) above 70 (humid) above 80 (very humid) Temperature (°C) below 16 (cold) below 12 (very cold) Carbon dioxide (ppm) above 1,500 (poorly ventilated) above 2,500 (very poorly ventilated) Mould risk (%) above 50 (risk of mould) above 75 (high risk of mould) Change the levels, or what they open, in Registers.
Safety certificates (
CERT): each for an asset; electrical condition reports and new electrical work (installation and minor works certificates), gas, lift, fire alarm, emergency lighting, sprinkler, riser, smoke control, water hygiene, asbestos and energy certificates, Building Regulations compliance certificates from competent person schemes, window and door, fire door, alarm check and completion certificates, due for review 30 days before they expire.Construction products (
PROD): manufacturer, Uniclass code, fire classification, certification, where each is used and whether it has been withdrawn, due for review 60 days before its certification expires.
AICO HomeLINK
The AICO HomeLINK connector reads your landlord account's homes from HomeLINK into Assets. Ask AICO for an API client id and secret, then switch it on.
| Feed | How often | What it does |
|---|---|---|
| Homes | Daily | Matches each HomeLINK property to the asset with its HomeLINK reference, and adds those not there yet, as homes titled by their address |
| Alarms and sensors | Daily | Keeps each home's Alarms and sensors list: serial number, model, kind, where it is, installed, replace by, last tested and status |
| Indoor readings | Hourly | Humidity, temperature and carbon dioxide from each environment sensor, by its serial number |
| Mould risk | Every 6 hours | HomeLINK's mould risk insight for each room |
| Alerts | Every 15 minutes | HomeLINK's alerts, such as fire and carbon monoxide alarms. A high damp and mould risk is the pack's damp alert, which opens a damp and mould case |
Fill in the HomeLINK reference on homes already in the register before switching it on, or they are added a second time. A home matched this way keeps its name and kind, so one brought by COBie stays in the building's COBie. HomeLINK keeps 30 days of readings; the system keeps the latest and each day's figures (see Readings and alerts). An alert HomeLINK stops reporting is not cleared here: clear it on the entry when it has been dealt with.
Also in the pack
- Public site: Building safety, with the hazard and concern forms. It is installed switched off.
- Letters: Hazard investigation summary; Building safety concern response.
- Reports and dashboard: open building safety work, hazards reported each month, open hazards by status, building changes by safety impact, the list of higher-risk buildings, and your own open work, on the Building safety overview dashboard.
- Roles: Building safety officer, Building safety manager.
- Information standard: ISO 19650 with the UK National Annex, on every case type: documents are named project, originator, volume, level, type, role and number, moved through work in progress, shared and published (publishing needs approval), and issued in transmittals. See Information standards. Each document still has its kind.
- COBie: a building's COBie workbook read into its assets (facility, floors and spaces), construction products and components, and written back out from the building. See Importing workbooks. Assets can now be of kind floor or level and space or room.
- Code lists: ISO 19650's suitabilities, document types and roles; and Uniclass's products (Pr), systems (Ss), elements and functions (EF), and spaces and locations (SL) tables, which come empty: load each from NBS's own file (see Code lists). A component's and a construction product's Uniclass code is chosen from the products table.
Check the time limits
The pack's time limits follow the regulations and Building Safety Regulator guidance as published in October 2026. Check each one against current guidance, and change the case types where your procedures differ.
Department
The pack brings the Building safety department, with nobody in it: choose who is in it under Departments. Its case types send new cases there, so they start in its queue rather than waiting for triage. Any other department can still be given its cases.