Appearance
Information standards
Some case types keep their documents to an information standard, such as ISO 19650 with the UK National Annex, which building safety teams use for the golden thread. The standard says how each document is named, the states it moves through, what it is suitable for in each, and how its revision reads. An administrator chooses a standard on the case type; packs bring them.
On such a case, each document on the Documents tab shows its name and where it is, such as:
WCC01-ARC-ZZ-00-DR-A-000123: Shared, S3 Suitable for review and comment, revision P01
Naming a document
Choose Give it its name. Enter each part as the standard sets out: for ISO 19650, the project, originator, volume or system, level or location, type, role and number. Parts that are codes, such as the type (DR for a drawing) and role (A for the architect), are chosen from their code lists as you type. The whole name is shown as you go, and must be the only one in the organisation.
A newly named document starts in the standard's first state, work in progress, as S0 at revision P01.1. Change its name renames it; its state and revision stay.
Revisions
Revisions follow the standard:
| When | Revision |
|---|---|
| Named | P01.1 |
| A new version while in progress | P01.2, P01.3… |
| Shared | P01 |
| Back in progress after sharing | P02.1 |
| Published | C01 |
| Back in progress after publishing | the next unused P, such as P03.1 |
| Archived | unchanged |
A new version of a shared or published document puts it back in progress, at a revision never used before, so changed information is checked again before it is relied on. The history records it.
Changing its state
Choose Change its state, then where it moves to and what it is suitable for there:
| State | Suitability (ISO 19650 UK) |
|---|---|
| Work in progress | S0 |
| Shared | S1 coordination, S2 information, S3 review and comment, S4 stage approval, S6 or S7 authorisation |
| Published | A1 to A7 authorised and accepted, B1 to B7 partially authorised, CR as constructed record |
| Archived | none |
A move the standard says needs approval, such as publishing, asks the people you choose, as approvals do. The document moves when the last of them approves, if it is still at the version they approved. Until then the document shows the approval, and that it will move.
Transmittals
Issue documents sends named documents to people for a purpose, such as S3 for review and comment: choose the documents (each goes at its latest version), what they are issued for, who they go to (people on the case with an email address, and other addresses) and a message.
They get one email from the case with the files attached and the transmittal's record, a PDF listing each document's name, revision, suitability and fingerprint (SHA-256), who it went to and when. The record is also saved on the case, and the transmittal is listed under Transmittals with its reference, such as HRB-2026-00012-TRN-001. You need the permission to email from cases.