Skip to content

Lists and schedules ​

A case type can keep up to ten lists on each case: numbered rows of the same details, such as a schedule of unused material, a schedule of loss or an inventory. They are on the case's Lists tab.

A list can belong to a register entry the case names instead, such as a building's components on its asset. It says "Kept on" the entry, with a link to it: its rows are the entry's, and changing them here changes them on the entry and on every other case that names it. Until the case names an entry, the list asks you to choose one under Details. See Registers.

Working with a list ​

  • Add a row: fill in the row's details, asked as a case's are, and choose Add the row.
  • Change a row, or Remove it.

Rows are numbered in order, and a number is never reused, so a schedule's items keep their numbers when one is removed. A removed row is kept, with who removed it. Every change is in the case's history ("added row 4 to …").

A closed case's lists are read-only.

Importing rows from a spreadsheet ​

Import from a spreadsheet adds up to 500 rows at once, such as a building's components from a survey or the actions from a fire risk assessment.

  1. Download a blank spreadsheet: a column for each detail, headed with its name.
  2. Fill in one row per line, written as people write them (choices by name, dates as 31/03/2024, yes or no), and save it as CSV.
  3. Check the spreadsheet. Problems are listed by line and column, and nothing is added until every row is right.
  4. Add … rows. They are numbered after the rows already there.

A spreadsheet downloaded from the list can be used: its Number column is ignored, and its rows are added as new ones.

To change rows already there instead, choose under What should each row do? to change the rows it matches (adding the rest, or not), and what to Match rows on: Number, as the list's own download writes it, or a detail such as a serial number. Only cells that say something different are changed, and the check says how many rows would be added, changed or left the same.

Downloading and saving ​

  • Download as a spreadsheet: the list as a CSV file. The download is in the audit log.
  • Add to the case as a PDF: a landscape PDF schedule saved with the case's documents, so it can go in a bundle or be shared. Bring the PDF up to date makes its next version.

Example: disclosure schedules ​

The Counter-fraud and investigations pack keeps the schedules of non-sensitive (MG6C) and sensitive (MG6D) unused material as two lists on each investigation, with the disclosure officer's view on the disclosure test and the prosecutor's decision. Sensitive material stays on the restricted investigation. It is never shared with the client portal unless someone saves its schedule as a PDF and shares that.

Genera: case management for UK public sector organisations